
{"id":5619,"date":"2012-12-20T15:48:40","date_gmt":"2012-12-20T12:48:40","guid":{"rendered":"https:\/\/controls.gr\/medium-voltage-substations-projects-4th-quarter-2012\/"},"modified":"2026-11-09T16:28:25","modified_gmt":"2026-11-09T13:28:25","slug":"medium-voltage-substations-projects-4th-quarter-2012","status":"publish","type":"post","link":"https:\/\/controls.gr\/en\/medium-voltage-substations-projects-4th-quarter-2012\/","title":{"rendered":"Medium Voltage Substations Projects 4th Quarter 2012"},"content":{"rendered":"<p>Our company <strong>Controls Vasiloglou<\/strong> has undertaken projects with a total capacity of 4 MWp for the 4th quarter of 2012.<\/p>\n<p>Indicative projects:<\/p>\n<ul>\n<li>Design and Construction of a 630 KVA (0.5 MWp) Medium Voltage Substation for a photovoltaic park in Karditsa<\/li>\n<li>Electrical Installation of a 100 KWp Photovoltaic Park in Kozani<\/li>\n<li>Design and Construction of a 630 KVA (0.5 MWp) Medium Voltage Substation for a photovoltaic park in Magnesia<\/li>\n<li>Design and Construction of a 315 KVA (0.25 MWp) Medium Voltage Substation for a photovoltaic park in Kavala<\/li>\n<li>Electrical Installation of a 100 KWp Photovoltaic Park in Oraiokastro, Thessaloniki<\/li>\n<li>Construction of Two Electrical Panels for 100 KWp PV Parks for parks in Corfu<\/li>\n<li>Construction of Two Electrical Panels for 100 KWp PV Parks for parks in Macedonia<\/li>\n<li>Design and Construction of Four Electrical Automation Panels for machinery to be exported to Romania<\/li>\n<\/ul>\n<p>The company&#8217;s substations consist of :<\/p>\n<ul>\n<li>Low-loss transformers from the Italian manufacturer Newton<\/li>\n<li>Schneider Electric Medium Voltage Fields<\/li>\n<li>Low Voltage Equipment from Schneider Electric<\/li>\n<\/ul>\n<p>Additionally, the company proceeded with the sale of 3 low-loss Medium Voltage transformers from the Italian manufacturer Newton, with a total capacity of 2 MWp. The increased demand for these specific transformers is due to their significant performance advantage compared to standard market transformers, as well as their <strong>fast <\/strong><strong>delivery times<\/strong>.<\/p>\n<p>Furthermore, our company is currently in discussions for another 10 substations and other automation applications, which are expected to commence in the 1st half of 2013.<\/p>\n<p>Finally, we would like to inform you that with more than 30 years of experience in technical projects, our company has successfully completed over 20 MWp of installed electrical capacity.<\/p>\n<div class=\"et_pb_slider et_pb_slider_fullwidth_off et_pb_gallery_post_type\">\n\t\t\t\t<div class=\"et_pb_slides\">\n\t\t\t\t\t<div class=\"et_pb_slide\" style=\"background: url(https:\/\/controls.gr\/wp-content\/uploads\/2018\/01\/Newton-3.jpg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/controls.gr\/wp-content\/uploads\/2018\/01\/Newton-2.jpg);\"><\/div><div class=\"et_pb_slide\" style=\"background: url(https:\/\/controls.gr\/wp-content\/uploads\/2018\/01\/Newton-1.jpg);\"><\/div>\n\t\t\t\t<\/div>\n\t\t\t<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Our company Controls Vasiloglou has undertaken projects with a total capacity of 4 MWp for the 4th quarter of 2012. Indicative projects: Design and Construction of a 630 KVA (0.5 MWp) Medium Voltage Substation for a photovoltaic park in Karditsa Electrical Installation of a 100 KWp Photovoltaic Park in Kozani Design and Construction of a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":5620,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[],"class_list":["post-5619","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/posts\/5619","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/comments?post=5619"}],"version-history":[{"count":0,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/posts\/5619\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/media\/5620"}],"wp:attachment":[{"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/media?parent=5619"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/categories?post=5619"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/controls.gr\/en\/wp-json\/wp\/v2\/tags?post=5619"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}