We are proud to have contributed to the reconstruction of a vessel that suffered severe fire damage, at one of the three largest shipyards in Greece.
Our company was entrusted with the design and installation of 24 low-voltage Form 4B panels, with the project awarded in February 2025 and successfully delivered by May 2025 — within a tight 4-month timeframe.
⚙️ Key challenges included:
- Dismantling and reinstallation of all panels inside the vessel
- Strict deadlines and high-quality standards
- Full inspection and certification of our testing lab by Bureau Veritas Group