M.V. Substation
Design of the M.V. Substation’s building. Installation of an ABB 2000KVA oil transformer and paralleling with an existing transformer. ABB Unisec M.V. Switchboard. L.V. electrical switchboard and reactive power compensation board. Electrical installations within the substation.
Energy Analysis
Installation of two medium and low voltage network analyzers, respectively. Installation of a data recording and analysis system